Tag

#engineering change order

Engineering changes

How do you read an engineering change order like ECO-2041?

An engineering change order is a short document that carries a lot of weight. Marcus Lindgren walks through what ECO-2041 says, what it does not say, and how a change travels from engineering to a distributor's counter.

Marcus Lindgren · Engineering Change Manager · · 4 min read